Short answer: confirm the date and permits, mark anything buried in the work area, get every car out the night before, keep children and pets indoors, and stay off the new surface until your contractor says it is ready.
The week before
1. Confirm the date and the weather plan
Asphalt is laid hot and needs suitable weather. Ask how rain or cold will change the date, and how you will be told.
2. Check the permit and the 811 call
If the job needs a driveway permit, make sure it has been issued before work starts. If there will be digging, your contractor is required to call Dig Safely New York first. See 10 questions to ask a paving contractor.
3. Mark sprinklers, lights and buried lines
811 marks public utility lines, not private ones. Flag sprinkler heads, landscape lighting cable, invisible pet fences and private pipes near the edges, and tell the crew where they are.
4. Plan where your cars will go
You will not be able to use the driveway for a few days. Find street or neighbor parking where cars will not block the trucks, and check any local parking rules.
5. Tell your neighbors
Trucks, a paver and a roller will be on your street for the day. A heads-up avoids blocked driveways and surprises.
The night before and the day
6. Clear the driveway and edges
Move cars, bikes, planters, basketball hoops and anything else off the driveway and away from the edges the crew will work along.
7. Keep children and pets inside
Hot asphalt and heavy machines are dangerous, and fresh asphalt takes paw and shoe prints easily.
8. Plan deliveries and trash pickup
Move bins to the curb early or hold them back a day, and pause deliveries that would need the driveway.
9. Walk the job with the crew
Before they start, agree the edges, where the driveway meets the road, how water will run off, and anything you want protected.
After
10. Know the aftercare
Ask when you can walk on it, when you can drive on it, and what to avoid at first, such as turning the steering wheel while parked or putting kickstands and jacks on the surface. Fresh asphalt can stay soft for weeks in hot weather. Ask when it will be ready for sealcoating.
Questions people ask
How long will I be off my driveway?
It depends on the weather and the job. Your contractor will tell you when it is safe to walk on and to drive on.
Do I need to be home on paving day?
It helps to be there at the start to walk the job with the crew and confirm the plan. After that, keep children and pets away from the work.
Last checked November 6, 2026.